Installation Instructions
Y-Plan Indirect Stowaway

1937-1  28/03/01

Heat Bank Thermal Store System  
Stowaway advanced F+E  
14 Plate Heat Exchanger (30 ltr/min)  
Indirect  
40mm Foam Insulation  
High duty primary coil  
Y-Plan primary controls  
Smartfit Controls  
All fitted controls are wired  
Manual Fill - No Overflow  
Backup Immersion Heater  
Low Water Level Indicator  
Cased  


1   Integral Expansion Vessel (Unpressurised)
2   Plate Heat Exchanger
3   Heat Exchanger Pump
4   Flow Switch
6   Manual Air Vent
7   Automatic Air Vent
8   Integral Overflow Chamber
9   Store Filling Point
11  Y-Pattern Strainer (supplied loose)
13  Connection to Expansion Vessel
14  Immersion Heater 3kW Incaloy with Stat
16  Cold Mains In, 22mm
17  Hot Mains Out, 22mm
18  Drain Cock
19  Flow From Boiler
21  Flow to Primary Coil
22  Return from Primary Coil
23  Flow to Heating Circuit
29  Primary Coil Balancing Valve
33  Honeywell Smartfit Control Centre
34  Honeywell Smartfit Room Unit, 7 day
35  Honeywell Smartfit Mid-Position Valve
38  Cylinder Immersion Thermostat
38  Honeywell Smartfit Cylinder Thermostat
39  White Coated Steel Casing
40  Tight Fitting Lid
54  Filling Loop (disconnect after use)
55  Water Level Switch
56  Manual Water Level Test and Drain
66  Overfill Drain Cock

 

Unit ID

SC-150-1937-1

Capacity

150

Base Diameter

450

Overall Diameter

530

Height

1200

Contents:
1. Introduction
2. General Requirements
3. Mains Water Supply
4. Connections:
5. Wiring
6. Filling
7. Commissioning
8. Fault Finding
9. Servicing
10. Spares
11. User Instructions